1,200 sq ft Area 4-Inch Slab Depth Ready-Mix Truck Recommended

How Much Concrete for a 30×40 Slab (4 Inches Thick)?

A 30×40 ft concrete slab (1,200 sq ft) poured 4 inches thick requires 14.81 cubic yards (400 cu ft) exact — or 16.3 cubic yards including a standard 10% waste buffer. In bags, order 734 bags (80 lb) or 978 bags (60 lb).

Concrete Volume (+10% Waste)
16.3 yd³
Exact: 14.81 yd³ (400 cu ft)
80-lb Concrete Bags
734 Bags
Exact: 667 bags · Est. ~$4,955
60-lb Concrete Bags
978 Bags
Exact: 889 bags · 40-lb: 1467 bags
Ready-Mix Truck Est.
$2,689
Cheaper & faster than hand-mixing

Interactive Concrete Slab & Bag Calculator

Total Order Quantity
16.3 Cubic Yards
80-lb Bags (0.60 cu ft/bag)734 bags
60-lb Bags (0.45 cu ft/bag)978 bags
40-lb Bags (0.30 cu ft/bag)1467 bags

Compare Popular Concrete Slab Dimensions (4-Inch)

4×4 (4") 6×6 (4") 8×8 (4") 8×10 (4") 8×12 (4") 10×10 (4") 10×12 (4") 10×14 (4") 10×16 (4") 10×20 (4") 12×12 (4") 12×14 (4") 12×16 (4") 12×20 (4") 12×24 (4") 14×14 (4") 14×20 (4") 16×16 (4") 16×20 (4") 16×24 (4")